Geotechnical Investigation for the proposed 220kV Dar Es Salaam to Morogoro Transmission line of SGR

Project Information

The scope of works included drilling fifty-eight (58Nos) boreholes with depth range from 10 – 20m below ground level, Standard Penetration Test (SPT), Collection of soil and rock samples, Dynamic cone penetration test (DCPT/DPL) at 460Nos location and Soil resistivity at all Tower sites. The assignment included laboratory testing and preparation of detailed investigation report.