Geotechnical Investigation for the proposed 220kV Dar Es Salaam to Morogoro Transmission line of SGR
Project Information
The scope of works included drilling fifty-eight (58Nos) boreholes with depth range from 10 – 20m below ground level, Standard Penetration Test (SPT), Collection of soil and rock samples, Dynamic cone penetration test (DCPT/DPL) at 460Nos location and Soil resistivity at all Tower sites. The assignment included laboratory testing and preparation of detailed investigation report.
CONTRACTOR Larsen and Toubro Limited
CLIENT Tanzania Electric Supply Company Limited (TANESCO)