Geotechnical Investigation for the Proposed Student Hostel to be built on Plot No 416 University Road
Project Information
The scope of works included exploratory drilling of three (3Nos) boreholes at depth 15m below ground level. The field works included Standard Penetration Test (SPT), collection of soil and rock samples, Laboratory test and preparation of detailed investigation report
CONSULTANT ARU Built Environment Consulting Company Limited (ABECC)
CLIENT Dar Es Salaam Development Corporation (DDC)